Public Procurements Southwest

Construction work

NUTS: CZ03 – Southwest

CPV: 45000000 – Construction work

  • ← Back to all (21)
  • 450 – Construction work (19)
  • 452 – Works for complete or part construction… (6)
  • 453 – Building installation work (5)
  • 454 – Building completion work (3)

Price Ranges: all

  • 0 – 999,999 or missing (3)
  • 10,000,000 – 99,999,999 (10)
  • 100,000,000 – 999,999,999 (6)
  • 1,000,000,000 – 9,999,999,999 (1)
Contracting Authority
Tender
Short Description
CPVs
CPVs NUTS Value From To
Construction of a new Central Admission pavilion at Stod Hospital, including a two-story building with technical facilities and a base for the Medical Emergency Service.AI
Kč 307,239,833Aug 17, 02:00Aug 26, 12:00
Provision of regular cleaning services for the Railway Administration's spaces, including publicly accessible and restricted areas, buildings, and exteriors, considering the operational needs of the contracting authority.AI
Kč 2,715,000,000Aug 14, 08:00Sep 25, 08:00
Construction of water supply lines and connections to ensure drinking water delivery to residents of the municipality of Komařice and local parts Pašinovice, Sedlo, and Stradov.AI
Kč 100,479,065Aug 13, 12:50Sep 4, 09:00
Construction of water supply networks and connections to ensure the delivery of drinking water to residents of Komařice and surrounding areas.AI
Kč 100,479,065Aug 13, 09:30Sep 4, 09:00
Implementation of the construction of a garage and a paved area at the Klokoty site in Tábor, focusing on prefabricated construction and ensuring rainwater drainage.AI
0Aug 13, 09:00Aug 26, 09:00
Implementation of garage and paved area construction at Klokoty site in Tábor as part of the project's second stage.AI
0Aug 10, 10:50Aug 19, 09:00
Renovation of building No. 309 in Horažďovice, adapted for educational use and youth accommodation, including the construction of a new stairwell and elevator.AI
Kč 85,711,480Aug 7, 10:20Sep 8, 10:00
Reconstruction of a military barracks and infirmary into residential buildings Block A14 Vyšný involves transforming existing structures into two new residential buildings and related public infrastructure.AI
Kč 226,018,978Aug 7, 08:00Aug 24, 10:00
Construction of a photovoltaic power plant on the roof of a new parking garage with a helipad at the hospital, with a minimum capacity of 1,394.94 kWp and the installation of 2,082 solar panels.AI
Kč 35,000,000Aug 7, 08:00Sep 9, 10:00
New construction of a parking house with 213 parking spaces and a P+R facility in Strakonice.AI
Kč 85,000,000Aug 6, 23:50Aug 21, 09:00
Construction modifications and extension at the Workers' House Hell site, including the restoration of the community hall and adjacent areas, with an emphasis on preserving historical elements.AI
Kč 595,000,000Aug 6, 08:00Aug 28, 10:00
Construction of an emergency base for ambulances in the Sušice hospital complex, including complete construction work and equipment for medical services.AI
Kč 99,789,570Aug 5, 14:20Sep 7, 10:00
Construction of a photovoltaic system on the roof of a new parking facility with a heliport at the České Budějovice hospital, with a minimum capacity of 1,394.94 kWp.AI
Kč 35,000,000Aug 3, 02:00Aug 24, 10:00
Implementation of insulation for the exterior facade of the 'Čtyřlístek' home in Plzeň to reduce energy consumption.AI
Kč 56,284,313Jul 31, 12:30Sep 3, 10:00
Construction of a new operational center designed as an energy-efficient facility with administrative and operational sections.AI
Kč 96,000,000Jul 28, 14:10Aug 26, 10:00
New construction of a senior home in Týn nad Vltavou, which will have a capacity of 80 beds and also includes a children's group for 20 children.AI
Kč 545,549,144Jul 24, 08:00Sep 4, 08:45
Construction of a photovoltaic system on the roof of a new parking building with a helipad at the hospital, achieving a minimum output of 1,394.94 kWp.AI
Kč 35,000,000Jul 21, 08:00Aug 21, 10:00
Implementation of insulation for the external facade of the 'Čtyřlístek' home in Plzeň, including window replacement and roof modifications.AI
Kč 56,284,313Jul 20, 14:50Aug 21, 10:00
Construction of an extension for the emergency room and new paved areas at the Český Krumlov hospital to enhance healthcare services.AI
0Jul 16, 08:00Aug 18, 23:59
Construction of an operational centre including administrative and operational parts, designed to be highly energy-efficient and water conservation-oriented.AI
Kč 96,000,000Jul 14, 15:00Aug 24, 10:00

Showing items 1–20 of 20

Prodejní formulář je vytvořen v systému SimpleShop.cz.