Supply and installation of a new condenser side for the ice surface cooling system at the Strakonice ice rink, including commissioning and operator training.AI |
|
| 42513000 – Refrigerating and freezing equipment, 45000000 – Construction work, 45310000 – Electrical installation work, 45331230 – Installation work of cooling equipment |
| 42513000 – Refrigerating and freezing equipment, 45000000 – Construction work, 45310000 – Electrical installation work, 45331230 – Installation work of cooling equipment | CZ031 – South Bohemian Region | Kč 5,380,360 | Mar 2, 02:01 | Mar 9, 10:00 |
Construction of a two-lane undivided road II/137 in section I/3 – Slapy, including bridges, culverts, and utility relocations, with a total length of 3.65 km.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 1,089,053,014 | Mar 2, 02:00 | Apr 14, 12:00 |
Implementation of three construction projects in the municipality of Sudoměřice near Bechyně, including the reconstruction of an intersection and the construction of a pressure sewer.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 102,153,782 | Feb 27, 14:30 | Mar 30, 14:15 |
Implementation of the complete renovation of the historic Bazar building in České Budějovice, including interior construction work and moisture remediation.AI |
|
| 45454100 – Restoration work, 44161200 – Water mains, 44221000 – Windows, doors and related items, 45000000 – Construction work, 45111000 – Demolition, site preparation and clearance work, 45231300 – Construction work for water and sewage pipelines, 45261310 – Flashing work, 45300000 – Building installation work, 45310000 – Electrical installation work, 45430000 – Floor and wall covering work |
| 45454100 – Restoration work, 44161200 – Water mains, 44221000 – Windows, doors and related items, 45000000 – Construction work, 45111000 – Demolition, site preparation and clearance work, 45231300 – Construction work for water and sewage pipelines, 45261310 – Flashing work, 45300000 – Building installation work, 45310000 – Electrical installation work, 45430000 – Floor and wall covering work | CZ031 – South Bohemian Region | Kč 68,720,693 | Feb 25, 12:20 | Mar 27, 09:00 |
Reconstruction of two weirs on the Skalský stream includes the removal of old parts and the construction of new reinforced concrete structures with modern equipment installation.AI |
|
| 45000000 – Construction work, 45223000 – Structures construction work, 45300000 – Building installation work, 45310000 – Electrical installation work |
| 45000000 – Construction work, 45223000 – Structures construction work, 45300000 – Building installation work, 45310000 – Electrical installation work | CZ031 – South Bohemian Region | Kč 10,901,643 | Feb 20, 09:20 | Mar 23, 10:00 |
Construction of a washing facility building at J. Žižka barracks in Jindřichův Hradec according to approved project documentation and building permit.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | 0 | Feb 18, 14:00 | Mar 12, 09:00 |
Implementation of thermal insulation and replacement of windows on the eleven-story K3 dormitory in České Budějovice, including associated construction works.AI |
|
| 45000000 – Construction work, 45321000 – Thermal insulation work, 45454100 – Restoration work |
| 45000000 – Construction work, 45321000 – Thermal insulation work, 45454100 – Restoration work | CZ031 – South Bohemian Region | Kč 51,981,976 | Feb 12, 08:00 | Mar 16, 09:00 |
Implementation of insulation and window replacement on eleven-story dormitory K3 in České Budějovice, along with additional associated construction works.AI |
|
| 45000000 – Construction work, 45321000 – Thermal insulation work, 45454100 – Restoration work |
| 45000000 – Construction work, 45321000 – Thermal insulation work, 45454100 – Restoration work | CZ031 – South Bohemian Region | Kč 51,981,976 | Feb 11, 13:00 | Mar 13, 09:00 |
Implementation of measures to reduce energy consumption of the Emauzy pilgrimage house, including the replacement of the heating system, windows, and insulation of the building's envelope.AI |
|
| 45000000 – Construction work, 42511110 – Heat pumps, 44221000 – Windows, doors and related items, 45231300 – Construction work for water and sewage pipelines, 45232141 – Heating works, 45261410 – Roof insulation work, 45262220 – Water-well drilling, 45310000 – Electrical installation work, 45321000 – Thermal insulation work, 45330000 – Plumbing and sanitary works, 45420000 – Joinery and carpentry installation work |
| 45000000 – Construction work, 42511110 – Heat pumps, 44221000 – Windows, doors and related items, 45231300 – Construction work for water and sewage pipelines, 45232141 – Heating works, 45261410 – Roof insulation work, 45262220 – Water-well drilling, 45310000 – Electrical installation work, 45321000 – Thermal insulation work, 45330000 – Plumbing and sanitary works, 45420000 – Joinery and carpentry installation work | CZ031 – South Bohemian Region | Kč 12,294,683 | Feb 10, 14:50 | Mar 5, 09:00 |
Reconstruction of roads II/170 and III/17016 in the village of Čestice, including sidewalk and bus stop adjustments, repair of historical walls, and installation of a traffic island to reduce speed.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 83,534,613 | Feb 10, 11:20 | Mar 12, 12:45 |
Homogenization of road III/10575 in the section Hluboká nad Vltavou and Hrdějovice includes reconstruction of the road and demolition of bridge ev. no. 10575-2 followed by construction of a new bridge.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 57,346,916 | Feb 9, 07:50 | Mar 11, 10:15 |
Construction of a two-lane road II/137 in section I/3 – Slapy, including bridges and relocations of engineering networks with a total length of 3.65 km.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 1,089,053,014 | Feb 9, 02:00 | Apr 9, 12:00 |
Reconstruction of road III/14325 between Dvůr Koroseky and Boršov nad Vltavou over a length of 2.064 km, including intersection modifications and construction of a new sidewalk.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 59,714,065 | Feb 6, 08:40 | Mar 11, 08:45 |
Implementation of energy-saving measures at Jiráskova 544 includes insulation, window and roof replacement, and installation of heat pumps and solar panels.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 57,528,745 | Feb 5, 10:10 | Mar 13, 09:00 |
Construction of a two-lane road II/137 in section I/3, including bridges and relocations of engineering networks to ensure smooth traffic flow.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 1,089,053,014 | Feb 2, 02:01 | Mar 23, 09:00 |
Construction of a two-lane road II/137 in section I/3 – Slapy, including bridges, culverts, and utility relocations.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 1,089,053,014 | Jan 19, 02:00 | Mar 19, 12:00 |