Public Procurements South Bohemian Region

Construction work

NUTS: CZ031 – South Bohemian Region

CPV: 45000000 – Construction work

Price Ranges: all

  • 0 – 999,999 or missing (1)
  • 1,000,000 – 9,999,999 (1)
  • 10,000,000 – 99,999,999 (9)
  • 100,000,000 – 999,999,999 (1)
  • 1,000,000,000 – 9,999,999,999 (4)
Contracting Authority
Tender
Short Description
CPVs
CPVs NUTS Value From To
Supply and installation of a new condenser side for the ice surface cooling system at the Strakonice ice rink, including commissioning and operator training.AI
Kč 5,380,360Mar 2, 02:01Mar 9, 10:00
Construction of a two-lane undivided road II/137 in section I/3 – Slapy, including bridges, culverts, and utility relocations, with a total length of 3.65 km.AI
Kč 1,089,053,014Mar 2, 02:00Apr 14, 12:00
Implementation of three construction projects in the municipality of Sudoměřice near Bechyně, including the reconstruction of an intersection and the construction of a pressure sewer.AI
Kč 102,153,782Feb 27, 14:30Mar 30, 14:15
Implementation of the complete renovation of the historic Bazar building in České Budějovice, including interior construction work and moisture remediation.AI
Kč 68,720,693Feb 25, 12:20Mar 27, 09:00
Reconstruction of two weirs on the Skalský stream includes the removal of old parts and the construction of new reinforced concrete structures with modern equipment installation.AI
Kč 10,901,643Feb 20, 09:20Mar 23, 10:00
Construction of a washing facility building at J. Žižka barracks in Jindřichův Hradec according to approved project documentation and building permit.AI
0Feb 18, 14:00Mar 12, 09:00
Implementation of thermal insulation and replacement of windows on the eleven-story K3 dormitory in České Budějovice, including associated construction works.AI
Kč 51,981,976Feb 12, 08:00Mar 16, 09:00
Implementation of insulation and window replacement on eleven-story dormitory K3 in České Budějovice, along with additional associated construction works.AI
Kč 51,981,976Feb 11, 13:00Mar 13, 09:00
Implementation of measures to reduce energy consumption of the Emauzy pilgrimage house, including the replacement of the heating system, windows, and insulation of the building's envelope.AI
Kč 12,294,683Feb 10, 14:50Mar 5, 09:00
Reconstruction of roads II/170 and III/17016 in the village of Čestice, including sidewalk and bus stop adjustments, repair of historical walls, and installation of a traffic island to reduce speed.AI
Kč 83,534,613Feb 10, 11:20Mar 12, 12:45
Homogenization of road III/10575 in the section Hluboká nad Vltavou and Hrdějovice includes reconstruction of the road and demolition of bridge ev. no. 10575-2 followed by construction of a new bridge.AI
Kč 57,346,916Feb 9, 07:50Mar 11, 10:15
Construction of a two-lane road II/137 in section I/3 – Slapy, including bridges and relocations of engineering networks with a total length of 3.65 km.AI
Kč 1,089,053,014Feb 9, 02:00Apr 9, 12:00
Reconstruction of road III/14325 between Dvůr Koroseky and Boršov nad Vltavou over a length of 2.064 km, including intersection modifications and construction of a new sidewalk.AI
Kč 59,714,065Feb 6, 08:40Mar 11, 08:45
Implementation of energy-saving measures at Jiráskova 544 includes insulation, window and roof replacement, and installation of heat pumps and solar panels.AI
Kč 57,528,745Feb 5, 10:10Mar 13, 09:00
Construction of a two-lane road II/137 in section I/3, including bridges and relocations of engineering networks to ensure smooth traffic flow.AI
Kč 1,089,053,014Feb 2, 02:01Mar 23, 09:00
Construction of a two-lane road II/137 in section I/3 – Slapy, including bridges, culverts, and utility relocations.AI
Kč 1,089,053,014Jan 19, 02:00Mar 19, 12:00

Showing items 1–16 of 16

Prodejní formulář je vytvořen v systému SimpleShop.cz.