Public Procurements Czech Republic

Building demolition and wrecking work and earthmoving work

NUTS: all

  • CZ01 – Prague (1)
  • CZ03 – Southwest (1)
  • CZ04 – Northwest (7)
  • CZ06 – Southeast (7)
  • CZ07 – Central Moravia (2)
  • CZ08 – Moravian-Silesian (3)

CPV: 45110000 – Building demolition and wrecking work and earthmoving work

  • ← Back to 451 – Site preparation work (24)
  • 45110 – Building demolition and wrecking work and… (11)
  • 45111 – Demolition, site preparation and clearance work (2)
  • 45112 – Excavating and earthmoving work (8)
  • 45113 – Siteworks (1)

Price Ranges: all

  • 10,000,000 – 99,999,999 (12)
  • 100,000,000 – 999,999,999 (9)
Contracting Authority
Tender
Short Description
CPVs
CPVs NUTS Value From To
Construction modifications of the ice surface at the Hodonín winter stadium, including adjustments to the cooling technology and the construction of a new snow pit.AI
Kč 54,840,505Aug 6, 12:40Sep 8, 13:00
Execution of construction works including the demolition of part of the existing building and the construction of new classrooms and workshops for practical training.AI
Kč 84,253,946Aug 4, 14:40Aug 20, 11:00
Construction of a new social and health complex consisting of three pavilions connected by an entrance hall, with new technical infrastructures and parking areas.AI
Kč 822,430,000Aug 4, 02:00Aug 15, 10:00
The park revitalization includes modifications of existing greenery, new plantings, and reconstruction of paths and furnishings for leisure activities.AI
Kč 11,490,000Aug 4, 02:00Aug 25, 15:30
Construction of a new emergency base for the South Moravian Region Emergency Medical Service in Břeclav, including the demolition of the existing building and the use of BIM methodology for project documentation.AI
Kč 161,983,000Jul 31, 14:01Sep 25, 10:00
Demolition work for the removal of the Za Lužánkami football stadium in Brno, which has been unused and in a state of disrepair for a long time.AI
Kč 165,087,523Jul 30, 14:00Aug 15, 09:00
Implementation of design and construction works to build public infrastructure and facilities around Medard Lake to support sustainable revitalization and resocialization of the area following coal mining.AI
Kč 525,000,000Jul 30, 14:00Aug 25, 10:00
Reconstruction and relocation of the existing inadequate sewer system in Mlýnská Street, Strakonice, to improve hydraulic properties and pipe capacity.AI
Kč 37,349,368Jul 29, 00:00Sep 1, 09:00
Revitalization of Peace Square in Fryšták focused on improving public spaces and green infrastructure, including modernization of the transfer terminal.AI
Kč 64,263,959Jul 28, 14:20Aug 14, 10:00
Execution of construction works involving the demolition of part of the existing building and the construction of new classrooms and workshops, including necessary technologies and paved areas.AI
Kč 84,253,946Jul 25, 23:40Aug 15, 11:00
Implementation of design and construction works to build public infrastructure around Lake Medard, aimed at revitalizing the area post-coal mining.AI
Kč 525,000,000Jul 24, 14:01Aug 21, 10:00
Preparation of architectural design, permitting documentation, and construction of a residential building, including engineering works and supplies.AI
Kč 80,000,000Jul 24, 09:40Aug 25, 10:00
Revitalization of a park area involving adjustments to existing trees, new planting, and refurbishment of pathways and furniture to create a recreational space.AI
Kč 11,490,000Jul 23, 14:00Aug 21, 15:30
Construction of two ponds, Upper and Lower, on a partially piped watercourse in the cadastral area of Bohdalec and Podolí nad Bobrůvkou for accumulation and retention purposes.AI
Kč 17,500,000Jul 18, 14:10Aug 12, 10:00
Construction of fencing, new service road, and removal of existing fencing at the airport according to project documentation.AI
Kč 23,500,000Jul 18, 14:02Aug 18, 12:00
Execution of construction works involving the demolition of the existing outdoor pool and the construction of new educational facilities for agricultural studies at Albrecht Secondary School in Český Těšín.AI
Kč 58,335,313Jul 15, 23:10Aug 13, 11:00
Implementation of design and construction works aimed at building public infrastructure and facilities around Lake Medard to support the sustainable development of the area after coal mining.AI
Kč 525,000,000Jul 11, 14:00Aug 18, 10:00
Revitalization of Míru Square in Fryšták focused on improving public spaces and green infrastructure, including modernization of the transfer terminal.AI
Kč 64,263,959Jul 11, 10:10Aug 12, 10:00
Implementation of design and construction works aimed at building public infrastructure and facilities around Lake Medard for sustainable revitalization and resocialization of the area after coal mining.AI
Kč 525,000,000Jul 3, 14:02Aug 13, 10:00
Construction of an emergency medical service base for the South Moravian Region in Břeclav, including the demolition of an existing hall and the use of BIM methodology for documentation processing.AI
Kč 161,983,000Jun 30, 02:02Sep 22, 10:00

Showing items 1–20 of 21

Prodejní formulář je vytvořen v systému SimpleShop.cz.