Public Procurements Czech Republic

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

NUTS: all

  • CZ01 – Prague (6)
  • CZ02 – Central Bohemia (5)
  • CZ03 – Southwest (3)
  • CZ04 – Northwest (4)
  • CZ05 – Northeast (11)
  • CZ06 – Southeast (5)
  • CZ07 – Central Moravia (2)
  • CZ08 – Moravian-Silesian (4)

CPV: 45230000 – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Price Ranges: all

  • 0 – 999,999 or missing (4)
  • 10,000,000 – 99,999,999 (20)
  • 100,000,000 – 999,999,999 (16)
Contracting Authority
Tender
Short Description
CPVs
CPVs NUTS Value From To
Reconstruction of the water pipeline in the municipalities of Hoštka, Malešov, Vrutice, and Polepy, including the laying of new pipes and adjustments to existing infrastructure.AI
Kč 142,543,799Dec 23, 08:00Jan 21, 09:00
Reconstruction and modernization of road II/647, including bridge remediation in the built-up area between Hrušov and Vrbice.AI
0Dec 23, 08:00Feb 2, 11:00
Reconstruction of Nádražní street including road renewal, communication adjustments, and parking spaces, along with public lighting replacement.AI
Kč 37,152,196Dec 22, 16:40Jan 29, 10:00
Execution of construction works including demolition of existing structures and construction of a new three-story pavilion for psychiatric departments.AI
Kč 439,161,000Dec 22, 02:01Jan 26, 10:00
Construction works aimed at establishing new green infrastructure in the center of Slavičín, including engineering networks and traffic modifications.AI
Kč 74,200,000Dec 19, 09:50Jan 23, 10:00
Construction of a new primary school building including a gym for 540 students at the site of the former T.G.M. barracks in Pardubice, meeting passive energy standards.AI
Kč 730,400,000Dec 19, 08:01Jan 29, 10:00
Construction work for the reconstruction and modernization of road II/452 between Karlovice and Světlá Hora, 10.083 km long, aimed at improving the road surface and drainage.AI
Kč 141,240,000Dec 18, 08:01Jan 13, 11:00
Construction of a reservoir and water treatment plant in Pecerady and Bukovany to ensure quality drinking water supply for local residents.AI
Kč 25,954,183Dec 18, 08:00Jan 29, 10:00
Construction of a water supply system and a new water tower in Pecerady and Zbořený Kostelec in Týnec nad Sázavou.AI
Kč 155,688,525Dec 18, 08:00Jan 29, 10:00
Reconstruction of road II/442 between Bohdanovice and Hořejší Kunčice, including maintenance of a bridge and retaining walls along the section.AI
Kč 38,736,000Dec 17, 08:01Jan 26, 11:00
Construction of a residential building with three above-ground floors and commercial spaces. The project also includes the creation of parking spaces and landscaping.AI
Kč 84,111,927Dec 16, 23:10Jan 27, 10:00
Construction and reconstruction of roadways including a roundabout and interchange, cycling path, and bus terminal in the Komořany and Zbraslav area.AI
Kč 351,000,000Dec 16, 08:00Jan 15, 10:00
Construction works aimed at creating green infrastructure in the center of Slavičín, including a new pedestrian bridge and engineering networks.AI
Kč 74,200,000Dec 15, 14:20Jan 20, 10:00
Construction works for a new psychiatry pavilion at Regional Hospital Jičín, including demolition of existing buildings and infrastructure development.AI
Kč 439,161,000Dec 15, 02:00Jan 19, 10:00
Execution of demolition and construction works on the Psychiatry Pavilion of the Regional Hospital Jičín, including the construction of new buildings and complete infrastructure.AI
Kč 439,161,000Dec 12, 08:01Jan 15, 10:00
Reconstruction of the water pipeline in the municipalities of Hoštka, Malešov, and Polepy, including the installation of new pipes and modifications to existing infrastructure.AI
Kč 142,543,799Dec 11, 08:01Jan 19, 09:00
Construction work aimed at expanding the emergency reception at Písek Hospital to increase capacity and improve services.AI
Kč 111,352,792Dec 11, 08:00Jan 15, 10:00
Construction of a three-story apartment building with commercial spaces and parking lots, including landscaping.AI
Kč 84,111,927Dec 10, 16:30Jan 27, 10:00
The reconstruction of the surroundings of Kostelní Street includes the renewal of roads and paved areas in Pardubice.AI
Kč 11,346,000Dec 10, 14:40Jan 8, 10:20
Reconstruction of bridge No. 432-040 over the track Prerov-Břeclav in Hodonín, including demolition of the existing bridge and construction of a new concrete bridge.AI
Kč 71,399,000Dec 10, 14:30Jan 14, 09:00

Showing items 1–20 of 40

Prodejní formulář je vytvořen v systému SimpleShop.cz.