Public Procurements Czech Republic

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

NUTS: all

  • CZ02 – Central Bohemia (6)
  • CZ03 – Southwest (2)
  • CZ04 – Northwest (3)
  • CZ05 – Northeast (2)
  • CZ06 – Southeast (5)
  • CZ07 – Central Moravia (2)
  • CZ08 – Moravian-Silesian (5)

CPV: 45230000 – Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

  • ← Back to 452 – Works for complete or part construction and civil engineering work (61)
  • 45230 – Construction work for pipelines, communication and… (2)
  • 45231 – Construction work for pipelines, communication and… (8)
  • 45232 – Ancillary works for pipelines and cables (9)
  • 45233 – Construction, foundation and surface works for… (11)
  • 45236 – Flatwork (2)
  • + Show more

Price Ranges: 10,000,000 – 99,999,999

Contracting Authority
Tender
Short Description
CPVs
CPVs NUTS Value From To
Construction of a new large gymnasium and renovation of the existing small gym in Opařany.AI
Kč 96,146,636Apr 17, 10:40May 21, 10:00
Expansion and modernization of the wastewater treatment plant in Čechtice, including sludge dehydration. The project involves construction work while maintaining the existing operation of the plant for 1,240 equivalent inhabitants.AI
Kč 57,243,925Apr 16, 13:20Apr 24, 09:00
Implementation and construction of bicycle paths in Šlapanicko, including all related works, services, and supplies according to project documentation.AI
Kč 57,550,000Apr 15, 20:50Apr 29, 10:00
Construction of an exhibition for the Bornean tapir at the ZOO and Castle Zlín – Lešná, including accommodations, outdoor aviaries, and water features.AI
Kč 46,125,000Apr 15, 09:30May 19, 10:00
Expansion and modernization of the wastewater treatment plant in Čechtice, including sludge dewatering. Construction will be carried out while maintaining the current operation of the plant.AI
Kč 57,243,925Apr 14, 13:00Apr 23, 09:00
Execution of construction works for the renewal of the roadway and sidewalks on Drobného street in Brno following infrastructure network renovations.AI
Kč 70,000,000Apr 13, 09:30May 14, 10:00
Execution of construction works for the repair of road III/4848 between Frydek-Mistek and Palkovice, including raising the road level by 50 mm.AI
Kč 38,804,293Apr 13, 02:01Apr 30, 08:00
Renovation of transport areas including the addition of a pedestrian crossing and accessibility adjustments for stops in the Slatina Housing Estate area.AI
Kč 16,200,000Apr 9, 14:10May 4, 09:00
Repair of road III/24210 in the section Dolínek – Panenské Břežany including revitalization of public space.AI
Kč 43,912,004Apr 9, 13:10Apr 30, 10:00
Expansion and modernization of the wastewater treatment plant in Čechtice and sludge drainage. The plant will serve 1,240 equivalent inhabitants with minimal disruption to existing operations.AI
Kč 57,243,925Apr 7, 08:50Apr 20, 09:00
Reconstruction of the water treatment plant includes modernization of technological parts and complete renovation, including the installation of a stripping station to remove VOC from water.AI
Kč 35,000,000Apr 7, 02:01May 7, 10:00
Modernization of the heating network in the Mír housing estate in Strakonice, including pipe replacement and installation of new heat transfer stations.AI
Kč 34,361,519Apr 2, 20:50May 5, 10:00
Repair of the bridge structure in Opava, including construction works on bridge No. 01130-1 and related roads.AI
Kč 16,770,248Mar 30, 15:00Apr 29, 08:00
Expansion of the tram loop in the Ostrava district of Výškovice to increase capacity and reduce noise pollution.AI
Kč 80,500,000Mar 30, 02:00Apr 27, 10:00
Intensification of the existing wastewater treatment plant in the municipality of Čebín aimed at improving its capacity and efficiency.AI
Kč 79,597,800Mar 30, 02:00Apr 30, 23:59
Renewal of sewage, water supply, and drainage in the area under the station in Čelákovice, including water level measurements on adjacent plots.AI
Kč 16,757,018Mar 26, 08:00Apr 27, 08:30
Construction modifications of the town hall building in Hodkovice nad Mohelkou, including the creation of barrier-free access and infrastructure modernization.AI
Kč 73,000,000Mar 25, 14:40Apr 29, 11:00
Construction works for the establishment of an outdoor sports facility at Primary School Březenecká 4679 in Chomutov, including demolition, earthworks, drainage, asphalt structures, and artificial turf installation.AI
Kč 24,403,536Mar 24, 11:40Apr 22, 10:00
Reconstruction and establishment of new paved and water areas in the castle park to enhance the microclimatic functions of the area.AI
Kč 45,625,873Mar 24, 09:10Apr 24, 09:00
Renewal and completion of utility networks under the train station in Čelákovice, including water level measurements in wells and the Elbe River.AI
Kč 16,757,018Mar 23, 02:00Apr 23, 08:30

Showing items 1–20 of 25

Prodejní formulář je vytvořen v systému SimpleShop.cz.