Public Procurements Czech Republic

Construction work for water projects

NUTS: all

  • CZ02 – Central Bohemia (3)
  • CZ04 – Northwest (9)
  • CZ05 – Northeast (1)
  • CZ06 – Southeast (2)
  • CZ07 – Central Moravia (2)
  • CZ08 – Moravian-Silesian (1)

CPV: 45240000 – Construction work for water projects

Price Ranges: all

  • 0 – 999,999 or missing (6)
  • 10,000,000 – 99,999,999 (1)
  • 100,000,000 – 999,999,999 (4)
Contracting Authority
Tender
Short Description
CPVs
CPVs NUTS Value From To
Shaping of the riverbed and repair of the longitudinal revetment of the Osoblaha river damaged by the flood in September 2024.AI
0Jul 24, 11:50Aug 5, 10:00
Construction of an injection tunnel, part of the concrete gravity dam at the Nové Heřminovy waterworks, including earthworks and access road construction.AI
0Jul 23, 14:00Aug 6, 10:00
Selection of a contractor for the revitalization of the Jezero watercourse in the cadastral area of Medlov, including the extension of the watercourse and the construction of ponds for water retention in the landscape.AI
0Jul 23, 11:50Aug 18, 09:00
Comprehensive regeneration of Houbalova Park including construction and landscaping with subsequent maintenance for three years.AI
Kč 61,771,262Jul 22, 17:30Sep 15, 09:00
Implementation of construction measures for erosion and flood protection in the Owl location in Tábor, aimed at improving the drainage conditions of the area.AI
Kč 128,314,528Jul 22, 10:20Aug 4, 10:00
Implementation of construction measures aimed at erosion and flood protection in the Owl area and piping in the Jordán region.AI
Kč 128,314,528Jul 16, 10:00Aug 3, 10:00
Construction of an injection gallery as part of the concrete dam at the Nové Heřminovy waterworks, including earthworks and blasting operations.AI
0Jul 14, 13:50Aug 5, 10:00
Implementation of design and construction work for the completion of a water treatment plant in Špindlerův Mlýn using the Design & Build method.AI
Kč 145,000,000Jul 10, 08:00Aug 10, 10:00
Construction of an injection tunnel as part of the technical solution for the right bank stabilization of the concrete gravity dam at the Nové Heřminovy waterworks, including earthworks and blasting.AI
0Jul 9, 12:50Jul 31, 10:00
Repair of the riverbed and longitudinal reinforcement of the Osoblaha watercourse damaged by flooding in September 2024.AI
0Jul 1, 13:30Jul 31, 10:00
Implementation of construction measures for erosion and flood protection in the Owl location, including drainage adjustments and landscape reinforcement.AI
Kč 128,314,528Jun 30, 10:20Jul 31, 10:00

Showing items 1–11 of 11

Prodejní formulář je vytvořen v systému SimpleShop.cz.