Public Procurements Czech Republic

Building completion work

NUTS: all

  • CZ01 – Prague (16)
  • CZ02 – Central Bohemia (3)
  • CZ03 – Southwest (4)
  • CZ04 – Northwest (1)
  • CZ05 – Northeast (2)
  • CZ06 – Southeast (3)
  • CZ07 – Central Moravia (3)
  • CZ08 – Moravian-Silesian (1)

CPV: 45400000 – Building completion work

  • ← Back to 45 – Construction work (183)
  • 4540 – Building completion work (5)
  • 4542 – Joinery and carpentry installation work (4)
  • 4543 – Floor and wall covering work (1)
  • 4544 – Painting and glazing work (4)
  • 4545 – Other building completion work (23)

Price Ranges: all

  • 0 – 999,999 or missing (3)
  • 1,000,000 – 9,999,999 (6)
  • 10,000,000 – 99,999,999 (18)
  • 100,000,000 – 999,999,999 (1)
  • 1,000,000,000 – 9,999,999,999 (5)
Contracting Authority
Tender
Short Description
CPVs
CPVs NUTS Value From To
Cleaning of public transport stops and open track surfaces on the banks of the Vltava, including winter cleaning and maintenance of areas near tram transformer stations.AI
Kč 200,000,000Aug 7, 14:00Sep 15, 10:00
Selection of a contractor for the construction of the new Smíchov transport terminal, which includes a bus station, platform above the tracks, and improvements to the station's forecourt.AI
Kč 7,124,313,780Aug 6, 14:00Sep 18, 10:00
Renovation of interior spaces to create collaborative areas for students in the ES building at the University of West Bohemia.AI
Kč 5,989,711Aug 6, 14:00Sep 10, 10:00
Project and engineering activities including energy refurbishment of the building, renovation of the historic facade, and related construction modifications.AI
Kč 65,000,000Aug 6, 09:20Oct 1, 12:00
Reconstruction of parking garage B11 including roofing of parking spaces, installation of a photovoltaic system, and modernization of the parking system.AI
Kč 64,255,000Aug 5, 15:20Sep 19, 09:00
Renovation of the ARO department and facilities at Jablonec nad Nisou Hospital to establish a new emergency admission unit, including three examination rooms and necessary staff facilities.AI
Kč 50,000,000Aug 4, 11:10Sep 15, 10:00
Construction modifications at ZŠ Wagnerovo nám. 458 in Beroun, including energy renovation and historical facade restoration using the Design-Build method.AI
Kč 65,000,000Jul 31, 17:50Sep 30, 12:00
Provision of construction maintenance and minor renovations in hospital buildings as per the contracting authority's needs.AI
Kč 25,000,000Jul 31, 14:00Sep 1, 10:00
Renovation of parking garage B11 including roofing of parking spaces, installation of a photovoltaic system, and modification of a green roof for new parking areas.AI
Kč 64,255,000Jul 31, 09:50Sep 12, 09:00
Renovation of the historic ZŠ Vojtěšská building and construction of changing rooms, including kitchen renovation based on project documentation.AI
Kč 83,003,970Jul 30, 21:20Aug 22, 10:00
Construction adjustments of classrooms and accessibility modifications of the school building in Prague 9, including a complete interior renovation and ensuring acoustic properties of the spaces.AI
Kč 12,267,500Jul 30, 18:41Aug 22, 12:00
Reconstruction construction works on the building of the District Court in Rakovník as part of the first stage.AI
0Jul 28, 15:10Sep 30, 12:00
Revitalization of the listed dispatch building in Cheb, including the restoration of facades, interiors, and technical equipment.AI
0Jul 28, 02:00Aug 27, 09:00
Construction work for the modernization of catering operations at SŠP Kyjov, including the reconstruction of the kitchen and its facilities.AI
Kč 12,652,000Jul 28, 02:00Aug 12, 10:00
Construction of a new transport terminal at Smíchov Railway Station, including a bus terminal, railway platform, and P+R parking.AI
Kč 7,124,313,780Jul 25, 14:01Sep 15, 10:00
Preparation of architectural design, permitting documentation, and construction of a residential building, including engineering works and supplies.AI
Kč 80,000,000Jul 24, 09:40Aug 25, 10:00
Insulation of the building envelope and roof of the manufacturing facility in Kameničky, including the replacement of windows and doors and heating optimization.AI
0Jul 21, 18:50Aug 13, 10:00
Revitalization of St. Vitus Church includes roof and facade repairs, along with electrical installation reconstruction.AI
Kč 45,349,495Jul 21, 14:00Aug 13, 08:30
Revitalization of the pilgrimage site includes the restoration of the Church of the Assumption of the Virgin Mary, arcades with chapels, and the southern three-story wing called 'Residence'.AI
Kč 34,993,623Jul 21, 12:10Aug 13, 08:00
Insulation of an administrative building including window and door replacement, removal of the existing façade, and installation of new insulation.AI
Kč 26,450,822Jul 21, 10:30Aug 13, 09:00

Showing items 1–20 of 33

Prodejní formulář je vytvořen v systému SimpleShop.cz.