Public Procurements South Bohemian Region

Construction work

NUTS: CZ031 – South Bohemian Region

CPV: 45000000 – Construction work

  • ← Back to all (17)
  • 450 – Construction work (16)
  • 451 – Site preparation work (5)
  • 452 – Works for complete or part construction… (10)
  • 453 – Building installation work (5)
  • 454 – Building completion work (1)

Price Ranges: all

  • 0 – 999,999 or missing (2)
  • 1,000,000 – 9,999,999 (2)
  • 10,000,000 – 99,999,999 (7)
  • 100,000,000 – 999,999,999 (5)
Contracting Authority
Tender
Short Description
CPVs
CPVs NUTS Value From To
New construction of a senior home in Týn nad Vltavou, which will have a capacity of 80 beds and also includes a children's group for 20 children.AI
Kč 545,549,144Jul 24, 08:00Sep 4, 08:45
Implementation of construction measures for erosion and flood protection in the Owl location in Tábor, aimed at improving the drainage conditions of the area.AI
Kč 128,314,528Jul 22, 10:20Aug 4, 10:00
Insulation of apartment buildings 261, 262, and 263 in Borotín to improve energy efficiency and reduce heating costs.AI
Kč 18,719,502Jul 21, 10:00Aug 12, 08:00
Construction of a photovoltaic system on the roof of a new parking building with a helipad at the hospital, achieving a minimum output of 1,394.94 kWp.AI
Kč 35,000,000Jul 21, 08:00Aug 21, 10:00
New construction of a parking house serving as a P+R facility in Strakonice with a capacity of 213 parking spaces and three floors.AI
Kč 85,000,000Jul 20, 17:00Aug 14, 09:00
Construction of a photovoltaic power plant with a capacity of 99 kWp on the roof of a primary school in Jindřichův Hradec, including modifications to electrical systems and lightning protection.AI
Kč 3,700,000Jul 20, 02:02Aug 18, 10:00
Implementation of construction measures aimed at erosion and flood protection in the Owl area and piping in the Jordán region.AI
Kč 128,314,528Jul 16, 10:00Aug 3, 10:00
Construction of an extension for the emergency room and new paved areas at the Český Krumlov hospital to enhance healthcare services.AI
0Jul 16, 08:00Aug 18, 23:59
Construction of an operational centre including administrative and operational parts, designed to be highly energy-efficient and water conservation-oriented.AI
Kč 96,000,000Jul 14, 15:00Aug 24, 10:00
Revitalization of the fire alarm system and related construction modifications for a senior home and special regime home on Rybniční Street, Strakonice.AI
Kč 7,520,573Jul 9, 08:00Aug 12, 07:00
Implementation of construction measures for erosion and flood protection in the Owl location, including drainage adjustments and landscape reinforcement.AI
Kč 128,314,528Jun 30, 10:20Jul 31, 10:00
Construction of a garage and a hardened area within the technical park in Klokoty, including stormwater drainage and the establishment of a permanent roadway.AI
0Jun 29, 11:40Aug 3, 09:00
Ensuring pre-production adjustments in the territory of the Šumava National Park and Protected Landscape Area, focusing on surface stabilization and wood handling.AI
Kč 19,424,500Jun 29, 02:00Jul 28, 08:00
Construction of a park focused on modern sports, including cycling paths, sports facilities, and public lighting.AI
Kč 61,545,682Jun 26, 10:20Jul 28, 08:00
Construction of a new parking house with 213 parking spaces and a P+R facility in Strakonice.AI
Kč 85,000,000Jun 22, 05:20Jul 27, 09:00
Reconstruction of a military barracks and infirmary into residential buildings in block A14, including the conversion of existing structures into two apartment buildings and the development of public infrastructure.AI
Kč 226,018,978Jun 18, 08:00Jul 31, 10:00

Showing items 1–16 of 16

Prodejní formulář je vytvořen v systému SimpleShop.cz.