Comprehensive reconstruction of an administrative building into a residential building with 17 apartments and a café, including new technical installations and ensuring heritage protection.AI
Kč 88,755,431Dec 18, 14:40Jan 22, 10:00
Insulation of the building including window replacement and installation of LED lighting, along with the installation of a central air handling unit with heat recovery to enhance energy efficiency.AI
Kč 13,320,665Dec 17, 09:20Jan 23, 09:00
Reconstruction of road II/442 between Bohdanovice and Hořejší Kunčice, including maintenance of a bridge and retaining walls along the section.AI
Kč 38,736,000Dec 17, 08:01Jan 26, 11:00
Implementation of insulation for MSA, a.s. hall to reduce energy costs and improve building energy efficiency.AI
Kč 69,617,314Dec 16, 11:10Jan 23, 08:30
Comprehensive reconstruction of an administrative building into a residential building with 17 apartments and a café on the ground floor.AI
Kč 88,755,431Dec 4, 15:30Jan 12, 10:00
Reconstruction of the bridge over Melčský Stream involves the removal of the existing structure and the construction of a new reinforced concrete bridge with stone embankments and a concrete coping with a steel railing.AI
Kč 11,826,438Dec 1, 10:50Jan 5, 08:00
Reconstruction of bridge No. 04810-1, including the demolition of the existing structure and construction of a new one. The total length of the bridge is 28.81 m.AI
Kč 39,759,755Dec 1, 08:40Jan 13, 08:00
Reconstruction of bridge No. 46420-2 on road III/46420, including construction modifications and road maintenance to ensure traffic safety.AI
Kč 13,829,716Dec 1, 07:10Jan 5, 08:00
Comprehensive reconstruction of an administrative building converted into a residential building with 17 apartments and a café on the ground floor.AI
Kč 88,755,431Nov 24, 16:30Dec 29, 10:00
Reconstruction of bridge No. 474-040 on road II/474 in Třanovice includes the demolition of the existing bridge and the construction of a new one at the same location.AI
Kč 13,950,799Nov 20, 11:50Jan 6, 08:00
Construction works for the reconstruction of bridge No. 01144-4, crossing the Olše River in Bystřice, including the demolition of the existing bridge and the construction of a new bridge structure.AI
Kč 75,152,187Nov 20, 10:10Jan 6, 08:00
Reconstruction of bridge No. 04810-1 involves demolishing the existing bridge and constructing a new structure over Luha Stream in Jeseník nad Odrou.AI
Kč 39,759,755Nov 20, 09:30Jan 6, 08:00