Implementation of a photovoltaic system on the roof of Primary School Šrámkova in Opava, including an energy storage battery system.AI |
|
| 09331200, 09332000, 45000000 – Construction work, 45310000 – Electrical installation work, 71320000 – Engineering design services |
| 09331200, 09332000, 45000000 – Construction work, 45310000 – Electrical installation work, 71320000 – Engineering design services | CZ080 – Moravian-Silesian Region | Kč 12,000,000 | Feb 16, 02:00 | Mar 19, 12:00 |
Implementation of a photovoltaic power plant on the roof of Edvard Beneš Primary School with a total capacity of at least 99 kWp and installation of a battery system with a capacity of at least 200 kWh.AI |
|
| 09331200, 09332000, 45000000 – Construction work, 45310000 – Electrical installation work, 71320000 – Engineering design services |
| 09331200, 09332000, 45000000 – Construction work, 45310000 – Electrical installation work, 71320000 – Engineering design services | CZ080 – Moravian-Silesian Region | Kč 12,000,000 | Feb 16, 02:00 | Mar 19, 12:00 |
Reconstruction of social facilities including construction work in the Secondary, Primary, and Kindergarten Kraslice building to improve conditions for students and staff.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ041 – Karlovy Vary Region | Kč 14,650,000 | Feb 13, 08:40 | Mar 16, 10:00 |
Reconstruction of the 4th floor of the gynecology building, including air conditioning and ventilation installation.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ063 – Vysočina Region | Kč 30,961,623 | Feb 13, 08:00 | Mar 13, 10:00 |
Construction of a new fire station and technical services facilities in Řevničov, including the demolition of the existing facility and landscaping.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ020 – Central Bohemian Region | Kč 52,000,000 | Feb 12, 19:10 | Mar 4, 10:00 |
Complete renovation of the historic Old Town Hall in Zábřeh, including construction work and interior modernization.AI |
|
| 45000000 – Construction work, 45212350 – Buildings of particular historical or architectural interest, 45453100 – Refurbishment work, 45454100 – Restoration work |
| 45000000 – Construction work, 45212350 – Buildings of particular historical or architectural interest, 45453100 – Refurbishment work, 45454100 – Restoration work | CZ071 – Olomouc Region | Kč 72,602,529 | Feb 12, 17:00 | Mar 5, 10:00 |
Construction modifications and insulation of the City Hall building in Litvínov, including changes to the interior and modernization of the facade.AI |
|
| 45000000 – Construction work, 45260000 – Roof works and other special trade construction works, 45261410 – Roof insulation work, 45310000 – Electrical installation work, 45313100 – Lift installation work, 45331000 – Heating, ventilation and air-conditioning installation work, 45332000 – Plumbing and drain-laying work, 45421132 – Installation of windows, 45421141 – Installation of partitioning, 45443000 – Facade work, 45454100 – Restoration work |
| 45000000 – Construction work, 45260000 – Roof works and other special trade construction works, 45261410 – Roof insulation work, 45310000 – Electrical installation work, 45313100 – Lift installation work, 45331000 – Heating, ventilation and air-conditioning installation work, 45332000 – Plumbing and drain-laying work, 45421132 – Installation of windows, 45421141 – Installation of partitioning, 45443000 – Facade work, 45454100 – Restoration work | CZ042 – Ústí nad Labem Region | Kč 40,000,000 | Feb 12, 14:40 | Mar 19, 09:00 |
Construction of a new 22 kV substation within the contracting authority's facility, including project work and engineering services.AI |
|
| 45000000 – Construction work, 45232220 – Substation construction work |
| 45000000 – Construction work, 45232220 – Substation construction work | CZ010 – Prague the Capital | Kč 51,000,000 | Feb 12, 13:00 | Mar 16, 10:00 |
Implementation of thermal insulation and replacement of windows on the eleven-story K3 dormitory in České Budějovice, including associated construction works.AI |
|
| 45000000 – Construction work, 45321000 – Thermal insulation work, 45454100 – Restoration work |
| 45000000 – Construction work, 45321000 – Thermal insulation work, 45454100 – Restoration work | CZ031 – South Bohemian Region | Kč 51,981,976 | Feb 12, 08:00 | Mar 16, 09:00 |
Reconstruction of water and sewage systems at the Primary and Nursery School Vyškov, Letní pole, including related works and supplies as per the project.AI |
|
| 45000000 – Construction work, 45332000 – Plumbing and drain-laying work |
| 45000000 – Construction work, 45332000 – Plumbing and drain-laying work | CZ064 – South Moravian Region | Kč 12,013,000 | Feb 11, 15:50 | Mar 11, 23:59 |
Construction of a parking house in Šestajovice to ensure adequate parking capacity for residents and visitors.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ020 – Central Bohemian Region | Kč 65,932,745 | Feb 11, 14:20 | Mar 19, 10:00 |
Implementation of insulation and window replacement on eleven-story dormitory K3 in České Budějovice, along with additional associated construction works.AI |
|
| 45000000 – Construction work, 45321000 – Thermal insulation work, 45454100 – Restoration work |
| 45000000 – Construction work, 45321000 – Thermal insulation work, 45454100 – Restoration work | CZ031 – South Bohemian Region | Kč 51,981,976 | Feb 11, 13:00 | Mar 13, 09:00 |
Demolition of the Plzeňky building and construction of a new parking lot in Kraslice to improve the area's transport infrastructure.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ041 – Karlovy Vary Region | Kč 17,000,000 | Feb 11, 11:00 | Mar 11, 10:00 |
Implementation of the internal reconstruction of the Dean's Office premises at the Faculty of Education in Žižkovo náměstí, Olomouc, including layout adjustments and modernization of technical installations.AI |
|
| 45000000 – Construction work, 45214300 – Construction work for college buildings, 45454100 – Restoration work |
| 45000000 – Construction work, 45214300 – Construction work for college buildings, 45454100 – Restoration work | CZ071 – Olomouc Region | Kč 29,500,000 | Feb 11, 08:00 | Mar 17, 09:00 |
Construction works for insulating production facilities to reduce energy consumption of buildings, including facades and roofs, without affecting the load-bearing structures.AI |
|
| 45000000 – Construction work, 45261410 – Roof insulation work, 45261900 – Roof repair and maintenance work, 45321000 – Thermal insulation work, 45421130 – Installation of doors and windows, 45454100 – Restoration work |
| 45000000 – Construction work, 45261410 – Roof insulation work, 45261900 – Roof repair and maintenance work, 45321000 – Thermal insulation work, 45421130 – Installation of doors and windows, 45454100 – Restoration work | CZ071 – Olomouc Region | Kč 53,605,000 | Feb 10, 16:00 | Mar 12, 10:00 |
Reconstruction of a football field including the construction of changing rooms, renovation of the playing surface, lighting, and utility networks.AI |
|
| 45000000 – Construction work, 45110000 – Building demolition and wrecking work and earthmoving work, 45112712 – Landscaping work for gardens, 45212200 – Construction work for sports facilities, 45212221 – Construction work in connection with structures for sports ground, 45236100 – Flatwork for miscellaneous sports installations, 45311000 – Electrical wiring and fitting work, 45332000 – Plumbing and drain-laying work, 45454100 – Restoration work |
| 45000000 – Construction work, 45110000 – Building demolition and wrecking work and earthmoving work, 45112712 – Landscaping work for gardens, 45212200 – Construction work for sports facilities, 45212221 – Construction work in connection with structures for sports ground, 45236100 – Flatwork for miscellaneous sports installations, 45311000 – Electrical wiring and fitting work, 45332000 – Plumbing and drain-laying work, 45454100 – Restoration work | CZ010 – Prague the Capital | Kč 80,000,000 | Feb 10, 15:10 | Mar 12, 10:00 |
Implementation of measures to reduce energy consumption of the Emauzy pilgrimage house, including the replacement of the heating system, windows, and insulation of the building's envelope.AI |
|
| 45000000 – Construction work, 42511110 – Heat pumps, 44221000 – Windows, doors and related items, 45231300 – Construction work for water and sewage pipelines, 45232141 – Heating works, 45261410 – Roof insulation work, 45262220 – Water-well drilling, 45310000 – Electrical installation work, 45321000 – Thermal insulation work, 45330000 – Plumbing and sanitary works, 45420000 – Joinery and carpentry installation work |
| 45000000 – Construction work, 42511110 – Heat pumps, 44221000 – Windows, doors and related items, 45231300 – Construction work for water and sewage pipelines, 45232141 – Heating works, 45261410 – Roof insulation work, 45262220 – Water-well drilling, 45310000 – Electrical installation work, 45321000 – Thermal insulation work, 45330000 – Plumbing and sanitary works, 45420000 – Joinery and carpentry installation work | CZ031 – South Bohemian Region | Kč 12,294,683 | Feb 10, 14:50 | Mar 5, 09:00 |
Construction of a new parking lot and related modifications, including public lighting installation near the swimming pool in Lanškroun.AI |
|
| 45000000 – Construction work, 34928500 – Street-lighting equipment, 34928510 – Street-lighting columns, 45223300 – Parking lot construction work, 45233160 – Paths and other metalled surfaces, 45316100 – Installation of outdoor illumination equipment |
| 45000000 – Construction work, 34928500 – Street-lighting equipment, 34928510 – Street-lighting columns, 45223300 – Parking lot construction work, 45233160 – Paths and other metalled surfaces, 45316100 – Installation of outdoor illumination equipment | CZ053 – Pardubice Region | Kč 14,315,000 | Feb 10, 12:00 | Mar 11, 12:00 |
Reconstruction of roads II/170 and III/17016 in the village of Čestice, including sidewalk and bus stop adjustments, repair of historical walls, and installation of a traffic island to reduce speed.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 83,534,613 | Feb 10, 11:20 | Mar 12, 12:45 |
Homogenization of road III/10575 in the section Hluboká nad Vltavou and Hrdějovice includes reconstruction of the road and demolition of bridge ev. no. 10575-2 followed by construction of a new bridge.AI |
|
| 45000000 – Construction work |
| 45000000 – Construction work | CZ031 – South Bohemian Region | Kč 57,346,916 | Feb 9, 07:50 | Mar 11, 10:15 |